1962

The production area was expanded, new thematic and engineering departments were established. The general design bureau was divided into separate design bureaus and departments.

A new laboratory & design building was commissioned.

Welding and casting shops were set up. The assembly and mechanical assembly shops were expanded. A shop for rubber items started manufacturing.

The Quality Control Department and central laboratory of measurement technology were set up.

The support of A.G. Nikolaev’s and P.R. Popovich’s spaceflights.

Three functioning mock-ups of the K-28 ejection seat were designed & developed, manufactured and transferred to the Customer.